Welded wire mesh in industrial flooring: how to use

Tela soldada em pisos industriais: como usar

THE welded wire mesh in industrial flooring It reinforces the concrete slab and helps control crack opening. However, its performance depends on the dimensions, the position within the slab, and the execution of the joints.

The floor also needs a stable subgrade, a prepared base, concrete compatible with the loads, and proper curing. The mesh does not correct flaws in these steps.

Therefore, the steel grade, wire diameter, mesh spacing, splices, and cover must follow the design. Choosing the most well-known model or the lowest price can lead to waste and compromise execution.

What is welded wire mesh for concrete?

Welded wire mesh is a prefabricated reinforcement composed of longitudinal and transverse steel wires. The wires are joined by welding at regular points, forming a mesh with standardized dimensions.

This configuration reduces spacing variations found in wire-by-wire assembled reinforcements. Furthermore, it facilitates the placement of the reinforcement in large areas.

Screens intended for concrete must meet the following requirements: ABNT NBR 7481:2022, Corrected Version 2:2023. The standard establishes requirements for ribbed welded steel mesh used as reinforcement.

In civil construction, the material appears in slabs, walls, pre-cast elements, pavements, and floors. Our content about welded wire mesh in civil construction It has other applications.

In industrial flooring, the function of the mesh depends on the calculations. It can act in controlling cracking or contribute to the slab's resistance, according to the solution defined by the designer.

Why do industrial floors require a specific design?

An industrial floor is subjected to different stresses than a residential subfloor. Forklifts, trucks, machinery, and storage structures apply loads with their own intensities and shapes.

A pallet rack, for example, concentrates forces on small support points. A forklift, on the other hand, transmits repeated loads through its wheels and aisles.

There are also distributed loads, impacts, vibrations, and temperature changes. Therefore, the design needs to consider the activity that will be carried out on the site.

Industrial flooring functions as a system consisting of soil, base, concrete slab, joints and finishing.. If one of these parts malfunctions, the others may lose performance.

IBRACON emphasizes this systemic view by treating the foundation soil, sub-base, slab, and pavement as interdependent parts of the pavement.

Therefore, simply defining the concrete thickness and the mesh design is not enough. Loads, soil type, and usage pattern must be factored into the design.

What is the function of welded wire mesh in flooring?

The mesh forms a distributed reinforcement in both directions of the plate. This feature helps to keep the steel organized over large areas.

One of its most common functions is to control the opening of cracks. Concrete undergoes shrinkage during drying and movements caused by temperature changes.

The reinforcement does not completely prevent these movements. However, it can limit the opening of cracks when it is sized and positioned according to the design.

In some flooring systems, the membrane also contributes to tensile strength. This function needs to be calculated based on the membrane thickness, the loads, and the support provided by the ground.

Therefore, we should not assume that any screen automatically increases the floor's capacity. The result depends on the quantity and position of the steel..

Proper application still requires planned joints and concrete curing. Without these precautions, the floor can crack even with a heavier mesh.

Does welded wire mesh eliminate cracks?

No. Welded wire mesh helps control cracking, but it does not eliminate all causes of cracks in concrete floors.

Shrinkage begins when concrete loses water and reduces its volume. If the slab encounters restrictions, internal stresses can cause cracking.

Temperature differences also cause floor movement. Areas exposed to sunlight, cold storage rooms, and areas near heated equipment require attention.

Other causes include poorly compacted soil, uneven thickness, excess water in the mixture, insufficient curing, and joints installed outside of the specified timeframe.

In these cases, increasing the amount of steel without addressing the root of the problem may not produce the desired result.

The screen acts primarily in distribution of reinforcement and control of crack opening. The joint design should direct some of these movements to designated locations.

Therefore, prevention depends on the combination of reinforcement, concrete, foundation, joints, and execution.

What loads should be evaluated?

The lifting of loads needs to reflect future operations. An empty warehouse during construction can accommodate heavy equipment after completion.

The designer must know the weight of the machines, the configuration of the stock, and the vehicles that will circulate in the area.

Among the most common requests are:

  • Point loads: Machine feet, shelves, and storage structures concentrate stress in small areas. The position of these supports must be compared to the joints and edges of the panel.
  • Mobile cargo: Forklifts, pallet jacks, and trucks apply repeated forces. Weight per axle, wheel type, and frequency of passage alter the stress.
  • Distributed loads: Materials stored directly on the floor spread their weight over larger areas. The actual distribution depends on the type of support.
  • Impacts and vibrations: Falling objects, machinery, and ongoing operations may require specific reinforcement and insulation measures.

The screen should not be chosen solely based on the total weight moved within the property. Geometry, frequency, and application point also affect the sizing.

Which areas can be fitted with welded wire mesh?

The screen can be specified for different concrete floors and pavements. The model and position change according to the function of the location: 

  • Industrial warehouses are among the best-known applications. In these, the structural design needs to take into account machinery, inventory, and internal movement.
  • Logistics centers experience repeated forklift traffic and concentrated loads on the racks. Therefore, the mapping of aisles and structures must be provided to the designer.
  • Parking lots can also use welded wire mesh. In this case, the calculations include vehicles, ramps, maneuvering areas, and exposure to the elements.
  • Cargo yards receive trucks, trailers, and larger impacts. The solution may require transfer bars, localized reinforcements, or other configurations in addition to the screen.
  • High-traffic commercial areas, supermarket floors, and reinforced sidewalks can also utilize the material. However, the choice should be based on the load and support conditions.

On our page products for civil construction, We offer screens, meshes, and other reinforcements designed for concrete.

How do I choose the right screen model?

The selection takes into account wire diameter, spacing, amount of steel per direction, and panel dimensions. This information must be included in the design and order.

Commercial wire meshes are designated as Q61, Q92, Q138, and Q196. Each code represents a specific wire configuration and steel area.

However, the number should not be used as an automatic indication for a type of flooring. A Q138 screen may be suitable for a particular project and insufficient or excessive for another.

The mesh can also have different spacing between the wires. Smaller spaces distribute more steel points, but alter weight, consumption, and performance.

The diameter affects the steel area and the panel's rigidity. Furthermore, it influences handling and behavior during concreting.

Before purchasing, we recommend checking the full screen designation, the panel dimensions and the project review.

Customers in Ceará can view models in the category of fabrics and meshes from our store, without replacing the technical validation from engineering.

What is the relationship between the screen and the CA-60?

Ribbed welded wire mesh used in concrete structures is produced with steel wires that must meet applicable requirements.

CA-60 is commonly used in this manufacturing process. Its strength class, adhesion, and regularity allow for the production of standardized reinforcements.

However, the buyer must check the complete product. It is not enough to know that the wires are CA-60, as the diameter, spacing, and steel area must also match the project specifications.

The quality of the welded points deserves the same attention. They maintain the geometry of the mesh during transport, positioning, and concreting.

Our content about CA-60 steel requirements It explains the characteristics of this category and its applications in armor.

Identifying the manufacturer, batch, and screen helps maintain traceability. This information should remain available until the material is inspected.

At Sinobras, we produce long steel products for the construction industry. At Aço Cearense Comercial, we distribute screens and meshes for different types of construction projects.

Why does the type of flooring affect the final result?

The concrete slab transfers loads to the layers located below it. When the support fails, unforeseen deformations and stresses arise.

The subgrade must have bearing capacity and compaction compatible with the project. Soils with weak points can generate localized settlement.

A sub-base helps to even out the support and can aid in drainage, depending on the solution adopted. Thickness, material, and degree of compaction must be controlled.

It is also necessary to correct holes, unevenness, and areas with loose material before pouring the concrete. An uneven base produces variations in the thickness of the slab.

Under these conditions, the screen alone cannot compensate for the loss of support. The floor may have uneven surfaces, cracks, or broken edges.

When the design calls for a vapor barrier, tarp, or slip layer, these components must be installed without improper folds.

The technical analysis of industrial floors published by IBRACON reinforces that performance depends on the overall system, and not just the concrete or the reinforcement.

Where should the screen be placed on the board?

The position of the screen is determined according to the function of the reinforcement. Therefore, it should not be left directly on the ground or on the tarp.

When the mesh remains at the bottom of the slab without proper technical planning, it may lose some of its ability to control cracks near the surface.

It is also not advisable to support the screen on the ground and lift it manually during concreting. This method results in uneven heights and does not allow for checking the final position.

The correct thing to do is to use spacers compatible with the load of the armor and the team. They must keep the screen at the indicated height without tipping it over.

The distance from the surface, edges, and joints depends on the design. There is no single measurement that applies to all floors.

The DER-SP technical specification for concrete pavements, for example, determines that the type and position of the mesh must be defined in the project.

Before pouring the concrete, the inspection team must measure the height at different points. They also need to verify that the spacers are distributed sufficiently.

How do I perform the overlays?

The panels need to maintain continuity at the points where they meet. To achieve this, the project defines overlaps, joints, or another connection method.

The width of the splice should not be chosen solely based on the team's experience. Wire diameter, spacing, and stress all influence the required length.

Overlaps that are smaller than planned can disrupt the continuity of the reinforcement. Excessive splices, on the other hand, increase steel consumption and make concreting more difficult.

The screens must be secured to prevent displacement. Ties can keep the panels aligned during team movement and concrete pouring.

At the edges, pillars, boxes, and openings, the design may require cutouts or reinforcements. Simply interrupting the grid can concentrate cracks at these points.

Cuts should be planned before installation. Burrs and exposed edges need to be treated to avoid injuring the team or altering the coating.

When there are two layers of screen, each needs its own spacers and positioning. This configuration should be clearly shown in the drawings.

What is the role of joints in industrial flooring?

The joints organize the floor's movements and divide large areas into smaller slabs. They also separate stages of concreting and elements that move differently.

Contraction joints create planned locations for crack opening. The cut needs to reach a depth and timeframe defined by the project.

Construction joints appear between concrete pouring stages. They may incorporate dowel bars or other devices to maintain alignment between slabs.

Isolation joints separate the floor from pillars, walls, machine bases, and other fixed elements.

The welded wire mesh should not span all joints without analysis. In some places, the reinforcement is interrupted. In others, the design defines continuity or specific reinforcement.

Transfer bars cannot be replaced by the screen either. They have a specific function in transmitting charges between plates.

Screen, joints, and transfer bars serve different functions.. The execution must follow the detailed plan for each meeting.

How does concrete affect screen performance?

The reinforcement works in conjunction with the concrete. Therefore, the strength, consistency, and homogeneity of the mixture affect the entire floor.

Adding water to the construction site without control alters the water-cement ratio. This can increase shrinkage, reduce strength, and promote surface wear.

The application process must also avoid segregation. Concentrated aggregates and areas with excess paste create variations within the slab.

During compaction, the team needs to fill the spaces around the wires. Voids near the reinforcement compromise the adhesion and protection of the steel.

The thickness of the board must remain uniform. Variations can create weak zones, even when the amount of screen is correct.

The surface finish needs to respect the concrete's natural state. Working the surface with added water or paste can result in a weak layer.

The construction of concrete structures must observe the ABNT NBR 14931:2023, in addition to the project specifications and the technological controls planned for the work.

Why is concrete curing essential?

Curing reduces the rapid loss of water during the early stages of concrete formation. Without this control, the surface dries before the interior, creating stresses.

This process can cause plastic cracking, wear, and reduced surface quality. The screen does not prevent these problems when curing is neglected.

The method should be defined according to the area, climate, and finish. Curing products, wet blankets, or other specified systems may be used.

Wind, heat, and low humidity accelerate evaporation. Floors installed under these conditions require planning to protect the surface immediately after finishing.

The circulation of people, machinery, and vehicles should only occur after the necessary resistance has been established. Releasing the floor too early can damage joints, edges, and the finish.

We also need to preserve the healing process in the areas surrounding the cuts. The jointing process should not leave the surface unprotected.

The inspection should record the time of concrete pouring, curing method, and weather conditions. This data helps analyze any potential problems that may arise later.

How to install a welded screen correctly?

The installation must follow a sequence that preserves the position, continuity, and cleanliness of the reinforcement.

The process can be organized into these steps:

  1. Check the documents: Validate the project review, screen model, joints, reinforcements, and levels before starting the service.
  2. Prepare the support: Compact and level the layers of the floor, installing tarpaulins or barriers as planned.
  3. Distribute the spacers: Position supports capable of maintaining the screen at the indicated height during concreting.
  4. Assembling the panels: Respect the direction, overlaps, edges, cutouts, and reinforcements defined in the drawings.
  5. Fix and inspect: Tie the ends together and measure the position of the reinforcement at various points.
  6. To finalize without moving the screen: Organize circulation, launch, and densification to preserve the installation.
  7. Perform healing and joints: to meet the deadlines, depths and methods planned for the floor.

Inspecting before pouring concrete prevents the need for corrections after the reinforcement is covered.

What are the most common errors during execution?

A common mistake is choosing a tile based on a previous installation. Similar tiles can withstand different loads, soil types, and joints.

Another problem occurs when the panels are placed directly on the base. In this position, the reinforcement may not perform its calculated function.

Insufficient overlaps also create discontinuity. Conversely, excessive splices consume steel and create congested areas.

Walking on the mesh without proper support can deform the panels and knock down the spacers. Pouring concrete can also displace the mesh.

Cutting the mesh around pillars without installing the planned reinforcements concentrates stress. The same occurs in drains, boxes, and equipment bases.

Joints installed late or in different locations than planned increase the risk of random cracking.

Finally, the lack of curing compromises the surface and increases shrinkage. No amount of reinforcement can correct all these deviations after the concrete has been poured.

How do I receive and store the screens?

The conference begins with a comparison between the order, the design, and the material identification. Designation, diameter, spacing, and dimensions must match.

The panels must arrive without any deformities that could hinder assembly. Broken weld points and displaced wires need to be documented.

The batch identification must remain legible. It links the material to the supplier's documents and controls.

During storage, the screens need to be kept off the ground. Distributed supports prevent warping and contact with standing water.

The models must be kept separate to prevent mix-ups. A building may receive visually similar screens, but with different steel areas.

Our guide on proper storage of steel It provides guidelines for organizing materials on the construction site.

Before use, the team must remove mud, oil, or substances that could impair adhesion to the concrete. Any significant corrosion needs to undergo a technical evaluation.

How to check the quality of welded wire mesh?

The screen must have dimensions, wires, spacing, and welds consistent with its designation. This information must be included in the product documentation.

Provenance allows for tracking of materials and verification of compliance with standards. Therefore, notes, labels, and reports must be kept organized.

Visual inspection verifies deformations, broken wires, welding defects, and contamination. When the project requires it, tests and certificates may also be requested.

Our article about technical reports for steel quality It explains what information helps to confirm properties and compliance.

At Grupo Aço Cearense, we maintain control processes for products intended for the construction industry. Purchases with clear identification facilitate receiving and reduce the risk of mix-ups.

However, control doesn't end with the supplier. Transportation, storage, and assembly must preserve the screen until the concrete pouring process.

Choose canvases and meshes for your project.

The use of welded wire mesh in industrial floors requires a design compatible with loads, soil, joints, and concrete. The correct choice avoids unnecessary consumption and reduces defects during installation.

At Aço Cearense Comercial, we distribute screens and meshes for floors, slabs, and other concrete structures. Our portfolio serves construction companies, industries, distributors, and construction professionals.

To view available models, dimensions, and products, Download our catalog. and send the project specifications for a quote.

Frequently asked questions about screens on floors

What is the difference between welded wire mesh and pop mesh?

Both products feature crossed and welded wires. However, dimensions, diameters, spacing, and applications may vary. The design should specify the product compatible with the structural function.

Is it possible to cut a welded wire mesh on the construction site?

Yes, when cuts are planned in the detailing. The team must preserve overlaps, coverings, and reinforcements around pillars, boxes, and openings.

Can an industrial floor use two layers of mesh?

Yes, provided that configuration has been properly dimensioned. Each layer needs to remain in the indicated position, with adequate spacers and sufficient distance for concreting.

Does slight oxidation prevent the screen from being used?

There is no single answer. The responsible technician must check for loss of section, scaling, and contamination. Mud, oil, and loose rust need to be removed before concreting.

When can vehicles drive on the new pavement?

The release time depends on the strength achieved by the concrete and the conditions defined in the project. The timeframe should not be determined solely by the dry appearance of the surface.

Can the screen be used to secure pipes in the floor?

The reinforcement should not be modified in a way that alters its position. Pipes, conduits, and inserts require their own supports and details, defined before concreting.