{"id":22964,"date":"2026-10-23T10:00:38","date_gmt":"2026-10-23T13:00:38","guid":{"rendered":"https:\/\/www.grupoacocearense.com.br\/?p=22964"},"modified":"2026-09-04T10:50:02","modified_gmt":"2026-09-04T13:50:02","slug":"estruturas-metalicas-2","status":"publish","type":"post","link":"https:\/\/www.grupoacocearense.com.br\/en\/estruturas-metalicas-2\/","title":{"rendered":"How can deformation in metal structures be avoided during assembly?"},"content":{"rendered":"<p><span style=\"font-weight: 400;\">When discussing construction and large industrial projects, there is a constant concern about the integrity of metal structures. Avoiding deformation is not only a matter of safety, but also of performance and durability of the structures.\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400;\">By understanding the main causes, such as misalignment, overload during transport, welding failures, and errors in structural planning, we can act preventively.\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400;\">In this article, you will understand how a well-planned assembly, rigorous load control, careful inspection, and proper engineering practices can make all the difference.<\/span><\/p>\n<h2><b>Understanding what deformations are in steel structures<\/b><\/h2>\n<p><span style=\"font-weight: 400;\">Technically, deformation is characterized by any <\/span><b>alteration in the original geometry or in the stress state of the element<\/b><span style=\"font-weight: 400;\">, and can occur in either elastic (reversible) or plastic (permanent) regimes.\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400;\">In everyday industrial and construction site environments, these pathologies manifest themselves through excessive deflection in beams after thermal welding processes, plumb deviations in columns during lifting, or localized damage, such as the crushing of profiles during transport.\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400;\">These phenomena are usually the result of mechanical stresses, thermal gradients, or failures in assembly logistics, requiring a rigorous examination of the overall stability of the system.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Geometric variations, however small they may seem at first glance, act as stress concentrators and can drastically alter the load distribution, compromising the safety of the building and the lifespan of its components.\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400;\">A beam that exhibits warping, for example, loses some of its inertia and may suffer lateral instability, generating losses ranging from costly rework and wasted resources to critical delays in the physical-financial schedule.\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Preventing deformation is a precision engineering imperative that preserves the integrity of the steel and ensures that the final structure operates with maximum efficiency and safety as designed.<\/span><\/p>\n<h2><b>Main factors that cause deformations<\/b><\/h2>\n<p><span style=\"font-weight: 400;\">There isn&#039;t a single isolated reason. We usually observe a combination of factors that accumulate throughout the stages of a project. Understand this!<\/span><\/p>\n<h3><b>Overloading during transport and lifting<\/b><\/h3>\n<p><span style=\"font-weight: 400;\">We often see that improper transportation of components is among the causes of deformation. This can occur, for example, when <\/span><b>Beams are loaded unevenly or there is excessive overlapping of components.<\/b><span style=\"font-weight: 400;\">, generating concentrated efforts.<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Crushing of profiles due to stacking without spacers.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Long, unbraced profiles that bend due to vibration from trucks on uneven roads.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Damage caused by improper rigging during lifting, resulting in bending or twisting.<\/span><\/li>\n<\/ul>\n<p><span style=\"font-weight: 400;\">During the lifting phase, if the support points are not correctly specified, the weight of the piece itself can cause irreversible deformation.<\/span><\/p>\n<h3><b>Misalignment errors during assembly<\/b><\/h3>\n<p><span style=\"font-weight: 400;\">When columns, beams, and bracing are not positioned according to the design, the assembly effort can generate undesirable stresses. Here, we often see the famous &quot;adjust here, push there&quot; causing warping.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">In practice, situations such as welding a part off-line or using unsuitable shims are common causes of this type of problem.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">A thorough pre-alignment check, before any final joining, drastically reduces the risk of deformation.<\/span><\/p>\n<h3><b>Improper welding<\/b><\/h3>\n<p><span style=\"font-weight: 400;\">Welding, a critical step in any <\/span><a href=\"https:\/\/www.grupoacocearense.com.br\/en\/vergalhao-de-aco\/\"><span style=\"font-weight: 400;\">steel structure<\/span><\/a><span style=\"font-weight: 400;\">, However, it can cause significant deformation if not performed correctly. Intense heat applied to localized areas causes the metal to shrink as it cools, resulting in warping, distortion, and misalignment.<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Poorly designed welds cause unnecessary stress on weak points;<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Welds made quickly without progressive cooling often deform thin sheets;<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">The absence of devices to limit movement during welding can cause parts to be displaced from their original alignment.<\/span><\/li>\n<\/ul>\n<h3><b>Failures in structural planning<\/b><\/h3>\n<p><span style=\"font-weight: 400;\">Often, deformations originate on the drawing board. Projects lacking proper detailing of connections, failure to account for assembly tolerances, or deficiencies in structural calculations make the entire process more susceptible to problems.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">A typical example in construction projects is when the assembly sequence is not taken into account or when shoring steps foreseen in the structural analysis are eliminated, thus assuming unnecessary risks.<\/span><\/p>\n<h3><b>Environmental conditions and improper handling<\/b><\/h3>\n<p><span style=\"font-weight: 400;\">The environment itself contributes to potential deformations, especially with larger parts or thin sheets exposed to excessive heat, strong winds, or humidity.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">We know that improper storage on construction sites, without protection from rain or intense sun, can alter the properties of steel and increase the risk of warping during handling.<\/span><\/p>\n<h2><b>Impact of deformations on the safety and performance of structures.<\/b><\/h2>\n<p><span style=\"font-weight: 400;\">Deformations not only impact aesthetics or the perfection of the assembly, but also directly influence the safety of industrial buildings, logistics warehouses, and... <\/span><a href=\"https:\/\/www.grupoacocearense.com.br\/en\/tipos-de-aco-na-construcao-civil\/\"><span style=\"font-weight: 400;\">civil works<\/span><\/a><span style=\"font-weight: 400;\">.\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400;\">A striking example involves changes in the alignment of the columns in a warehouse: even a small deviation can compromise system performance, overload connections, and cause local instability.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">A compromised structure is a threat to the integrity of the entire project. <\/span><span style=\"font-weight: 400;\">Furthermore, the deformities can lead to consequences such as:<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Reduction in the load capacity of the assembly;<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Difficulty in completing the enclosure with panels or other construction systems;<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Increased demand for corrective maintenance;<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Risks of accidents and incidents on the construction site;<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Delays and extra costs to the project.<\/span><\/li>\n<\/ul>\n<h2><b>Good practices to avoid deformation during assembly and transport.<\/b><\/h2>\n<p><span style=\"font-weight: 400;\">At Grupo A\u00e7o Cearense, we guide our teams and partners to adopt a series of practical measures, observing each stage of the cycle: <\/span><b>From the arrival of the steel at the construction site, through storage, handling, internal transport, lifting and final assembly.<\/b><\/p>\n<h3><b>Detailed assembly planning<\/b><\/h3>\n<p><span style=\"font-weight: 400;\">Ideally, you should never improvise. An advance assembly plan, with an adjusted schedule and analysis of potential interferences, avoids unforeseen problems. Among the critical planning stages are:<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Defining the assembly sequence, ensuring temporary shoring and bracing;<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Thorough inspection of the bases and foundations before elevations;<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Allocation of equipment compatible with the weight and geometry of the parts;<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Preliminary verification of environmental conditions, anticipating shutdowns if necessary.<\/span><\/li>\n<\/ul>\n<h3><b>Load control in transport and lifting.<\/b><\/h3>\n<p><span style=\"font-weight: 400;\">One tip we always emphasize is the proper distribution of parts on the trucks and the correct choice of lifting supports. Never overload specific points and using adequate protection reduces damage.<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Use of wooden or rubber wedges at points of contact;<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Fastening with straps that do not cause constriction of the profiles;<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Distribution of parts by size and weight to avoid concentration of stress;<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Itineraries of <\/span><a href=\"https:\/\/www.grupoacocearense.com.br\/en\/5-desafios-do-setor-de-transporte-de-cargas-e-como-supera-los\/\"><span style=\"font-weight: 400;\">transport<\/span><\/a><span style=\"font-weight: 400;\"> planned, avoiding jolts and abrupt maneuvers.<\/span><\/li>\n<\/ul>\n<h3><b>Continuous alignment and checking during assembly.<\/b><\/h3>\n<p><span style=\"font-weight: 400;\">We&#039;ve found in practice that small deviations tolerated at the start can turn into major headaches as the project progresses. Using levels, plumb bobs, and lasers during assembly makes all the difference. For daily work, we recommend:<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Thorough inspection of fittings and connections before final tightening;<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Periodic verification of plumb and level at each assembly cycle;<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Only allow welding to proceed after checking the alignment;<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Photographic documentation of critical alignments as a record.<\/span><\/li>\n<\/ul>\n<p><span style=\"font-weight: 400;\">This control prevents the accumulation of small tolerances from generating significant deviations in the end.<\/span><\/p>\n<h3><b>Correct welding procedures<\/b><\/h3>\n<p><span style=\"font-weight: 400;\">No other process interferes with the integrity of the structure as much as welding. Proper execution depends on trained personnel and appropriate procedures. Among the recommendations, it is worth paying attention to:<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Alternating welding sequence, minimizing heat concentration at a single point;<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Use of fastening devices and jigs to ensure the immobility of the elements;<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Skilled welders and visual inspection before, during, and after welding;<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Controlled cooling, preventing thermal shocks between nearby regions.<\/span><\/li>\n<\/ul>\n<h3><b>Proper storage and handling<\/b><\/h3>\n<p><span style=\"font-weight: 400;\">What seems simple ends up being one of the biggest villains on the construction site: storing and moving steel the right way makes a big difference. This includes keeping profiles elevated from the ground, avoiding direct exposure to sun and rain, and ensuring that no element deforms during stacking.<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Store parts on level ground, using wooden blocks to prevent direct contact;<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Cover the items with tarpaulins in outdoor areas to limit the effects of the weather;<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Do not stack lightweight profiles under heavy loads.<\/span><\/li>\n<\/ul>\n<h2><b>Lessons learned in real-life situations.<\/b><\/h2>\n<p><span style=\"font-weight: 400;\">We will present some situations that we have already monitored or resolved together with partners and clients of the A\u00e7o Cearense Group, illustrating how small actions prevent big problems.<\/span><\/p>\n<h3><b>Misalignment of industrial sheds<\/b><\/h3>\n<p><span style=\"font-weight: 400;\">In a logistics warehouse construction project, the haste in lifting the beams resulted in the columns becoming misaligned. There was no systematic checking during assembly. The error was only noticed during the side closure: the panels did not fit together, and the rework caused delays and the need to cut and adjust elements, something that could have been avoided by checking the plumb at the end of each stage.<\/span><\/p>\n<h3><b>Warping of lightweight profiles during transport<\/b><\/h3>\n<p><span style=\"font-weight: 400;\">We received an order to supply profiles for a metal roof structure for a school. Upon unloading, we noticed several pieces with slight bends. Upon inspection, it became clear that the truck had transported everything together, without spacers or individual securing. It was necessary to replace a large portion of the pieces and adjust the securing protocols with the transporter.<\/span><\/p>\n<h3><b>Distortion of sheet metal after welding<\/b><\/h3>\n<p><span style=\"font-weight: 400;\">In one factory, thin metal sheets warped when welded without heat intercalation. The &quot;banana&quot; effect was visible, preventing subsequent assembly on the equipment. A review of procedures, including gradual cooling and the use of jigs, solved the problem in subsequent shipments.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">These construction details demonstrate that well-applied technology and control are powerful allies in preventing unwanted deformations. Learn more about some examples of remarkable steel structures in this article about famous steel structures.<\/span><\/p>\n<h2><b>Practical tips for assembly teams<\/b><\/h2>\n<p><span style=\"font-weight: 400;\">We have put together a practical roadmap that our teams use and recommend to projects and partners who are also looking for safe and durable metal structures:<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-checked=\"false\" aria-level=\"1\"><span style=\"font-weight: 400;\">Always review the detailed design before starting assembly;<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-checked=\"false\" aria-level=\"1\"><span style=\"font-weight: 400;\">Avoid improvising: use only appropriate devices and tools;<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-checked=\"false\" aria-level=\"1\"><span style=\"font-weight: 400;\">To train crane operators and welders to handle the specific details of steelwork;<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-checked=\"false\" aria-level=\"1\"><span style=\"font-weight: 400;\">Record the condition of the parts and adjustments made daily, documenting any non-conformities;<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-checked=\"false\" aria-level=\"1\"><span style=\"font-weight: 400;\">Conduct periodic inspections, preferably with the support of specialists in metal structures;<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-checked=\"false\" aria-level=\"1\"><span style=\"font-weight: 400;\">Monitor all welding cycles with continuous verification of the original alignment;<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-checked=\"false\" aria-level=\"1\"><span style=\"font-weight: 400;\">Report any questions or deviations during assembly to the technical supervisor immediately.<\/span><\/li>\n<\/ul>\n<h2><b>Industrial and technological solutions: the role of the A\u00e7o Cearense Group<\/b><\/h2>\n<p><span style=\"font-weight: 400;\">Experience shows that product selection makes a difference in the final result. At Grupo A\u00e7o Cearense, Sinobras guarantees highly reliable raw materials and the best industrial practices in steel production.\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400;\">A\u00e7o Cearense is a leading supplier and distributor advisor, supporting project development, assembly training, and fast delivery in Cear\u00e1. Among the factors that contributed to projects with less deformation, we highlight:<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Steel profiles and sheets carefully inspected in a certified industrial process;<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Technical guidance on assembly methods for B2B clients;<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Proven experience in large-scale construction projects as well as small-scale assembly projects;<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Sustainable solutions, with environmental awareness in processes and relevant social initiatives.<\/span><\/li>\n<\/ul>\n<h2><b>Prevention throughout the supply chain: from steel to assembly.<\/b><\/h2>\n<p><span style=\"font-weight: 400;\">A well-executed metal structure is the result of an integrated chain: from the choice of supplier, through transport, receiving, storage, assembly, to finishing and release for use.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Preventing deformation depends on shared responsibility among those who design, manufacture, transport, assemble, and inspect. Therefore, it is essential to have suppliers who operate in all links of the process, as we do at Grupo A\u00e7o Cearense, and teams trained to follow engineering recommendations at each stage.<\/span><\/p>\n<h2><b>A safe metal structure is the result of attention to every detail.<\/b><\/h2>\n<p><span style=\"font-weight: 400;\">Avoiding deformation requires careful attention, rigorous planning, and a commitment to best practices. Each step, from design to finishing, plays its role. Controlling loads, conducting regular inspections, and investing in proper alignment and welding ensure not only cost savings but also reliability in steel projects.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Throughout our journey, we&#039;ve learned that choosing committed suppliers, trained professionals, and well-defined processes is the key to the success of any project involving metal components.\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Count on us to support your business in the search for safe, sustainable solutions that deliver results that overcome challenges.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">If you work in construction, industry, or metalworking, connect with the Grupo A\u00e7o Cearense ecosystem on social media \u2014 <\/span><a href=\"https:\/\/www.instagram.com\/grupoacocearense\/\"><span style=\"font-weight: 400;\">Instagram<\/span><\/a><span style=\"font-weight: 400;\">, <\/span><a href=\"https:\/\/www.facebook.com\/grupoacocearense\"><span style=\"font-weight: 400;\">Facebook<\/span><\/a><span style=\"font-weight: 400;\">, <\/span><a href=\"https:\/\/www.linkedin.com\/company\/grupo-a%C3%A7o-cearense\/\"><span style=\"font-weight: 400;\">LinkedIn<\/span><\/a><span style=\"font-weight: 400;\"> and <\/span><a href=\"https:\/\/www.youtube.com\/grupoacocearense\"><span style=\"font-weight: 400;\">Youtube<\/span><\/a><span style=\"font-weight: 400;\"> \u2014 and gain immediate access to technical analyses, market trends, and steel solutions.<\/span><\/p>\n<h2><b>Frequently asked questions about deformations in metal structures during assembly.<\/b><\/h2>\n<h3><b>What causes deformations in metal structures?<\/b><\/h3>\n<p><span style=\"font-weight: 400;\">Deformations are mainly caused by overloading during transport and lifting, misalignment during assembly, inadequate welding, flaws in structural planning, and also by improper storage or handling of steel. Environmental factors, such as heat, humidity, and wind, can also contribute, in addition to poor practices during construction.<\/span><\/p>\n<h3><b>How to avoid warping during assembly?<\/b><\/h3>\n<p><span style=\"font-weight: 400;\">The best way to avoid warping is to follow a detailed assembly plan, use devices to ensure the alignment of parts, and periodically check plumb and level during construction. Maintaining correct welding procedures, controlling loads at each stage, and storing materials properly are also fundamental actions.<\/span><\/p>\n<h3><b>What are the main precautions to take when assembling metal?<\/b><\/h3>\n<p><span style=\"font-weight: 400;\">Key precautions include constant alignment checks, use of correct tools, prior inspection of supports, welding under technical supervision, shoring in the prescribed sequence, and training of the teams involved in the process. Daily monitoring with recording of any problems further increases safety.<\/span><\/p>\n<h3><b>How to correct deformations in steel structures?<\/b><\/h3>\n<p><span style=\"font-weight: 400;\">In some cases, when deformations are small and within the tolerances indicated by the design, it is possible to make local adjustments with controlled force devices, localized heating, or recalibration. When deformations are large or compromise safety, it may be necessary to replace the element or carry out structural reinforcements indicated by specialized engineers.<\/span><\/p>\n<h3><b>Is it expensive to prevent deformation in metal structures?<\/b><\/h3>\n<p><span style=\"font-weight: 400;\">In practice, the investment in prevention is much lower than the costs associated with rework, delays, and replacing deformed parts. Good assembly, inspection, and storage practices require little increase in costs and provide a financial return by reducing future failures and increasing the durability of the structure.<\/span><\/p>","protected":false},"excerpt":{"rendered":"<p>When we talk about construction and large industrial projects, there is a constant concern about integrity (\u2026)<\/p>","protected":false},"author":8,"featured_media":22965,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":""},"categories":[1],"tags":[],"class_list":["post-22964","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-sem-categoria"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.6 (Yoast SEO v28.6) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Como evitar deforma\u00e7\u00f5es em estruturas met\u00e1licas durante a montagem? - Grupo A\u00e7o Cearense<\/title>\n<meta name=\"description\" content=\"Descubra causas comuns de deforma\u00e7\u00f5es em estruturas met\u00e1licas e saiba como prevenir erros no transporte, soldagem e montagem.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.grupoacocearense.com.br\/en\/estruturas-metalicas-2\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Como evitar deforma\u00e7\u00f5es em estruturas met\u00e1licas durante a montagem?\" \/>\n<meta property=\"og:description\" content=\"Descubra causas comuns de deforma\u00e7\u00f5es em estruturas met\u00e1licas e saiba como prevenir erros no transporte, soldagem e montagem.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.grupoacocearense.com.br\/en\/estruturas-metalicas-2\/\" \/>\n<meta property=\"og:site_name\" content=\"Grupo A\u00e7o Cearense\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-23T13:00:38+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.grupoacocearense.com.br\/wp-content\/uploads\/2026\/06\/image1-4.png\" \/>\n\t<meta property=\"og:image:width\" content=\"880\" \/>\n\t<meta property=\"og:image:height\" content=\"581\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Samuel Faria\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Samuel Faria\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"13 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.grupoacocearense.com.br\\\/estruturas-metalicas-2\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.grupoacocearense.com.br\\\/estruturas-metalicas-2\\\/\"},\"author\":{\"name\":\"Samuel Faria\",\"@id\":\"https:\\\/\\\/previews.elleven.digital\\\/acocearense\\\/#\\\/schema\\\/person\\\/7ccebb269b40e44958dadd1a0f2e91db\"},\"headline\":\"Como evitar deforma\u00e7\u00f5es em estruturas met\u00e1licas durante a montagem?\",\"datePublished\":\"2026-10-23T13:00:38+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.grupoacocearense.com.br\\\/estruturas-metalicas-2\\\/\"},\"wordCount\":2596,\"commentCount\":0,\"image\":{\"@id\":\"https:\\\/\\\/www.grupoacocearense.com.br\\\/estruturas-metalicas-2\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.grupoacocearense.com.br\\\/wp-content\\\/uploads\\\/2026\\\/06\\\/image1-4.png\",\"articleSection\":[\"Sem categoria\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/www.grupoacocearense.com.br\\\/estruturas-metalicas-2\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.grupoacocearense.com.br\\\/estruturas-metalicas-2\\\/\",\"url\":\"https:\\\/\\\/www.grupoacocearense.com.br\\\/estruturas-metalicas-2\\\/\",\"name\":\"Como evitar deforma\u00e7\u00f5es em estruturas met\u00e1licas durante a montagem? - Grupo A\u00e7o Cearense\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/previews.elleven.digital\\\/acocearense\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.grupoacocearense.com.br\\\/estruturas-metalicas-2\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.grupoacocearense.com.br\\\/estruturas-metalicas-2\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.grupoacocearense.com.br\\\/wp-content\\\/uploads\\\/2026\\\/06\\\/image1-4.png\",\"datePublished\":\"2026-10-23T13:00:38+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/previews.elleven.digital\\\/acocearense\\\/#\\\/schema\\\/person\\\/7ccebb269b40e44958dadd1a0f2e91db\"},\"description\":\"Descubra causas comuns de deforma\u00e7\u00f5es em estruturas met\u00e1licas e saiba como prevenir erros no transporte, soldagem e montagem.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.grupoacocearense.com.br\\\/estruturas-metalicas-2\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.grupoacocearense.com.br\\\/estruturas-metalicas-2\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.grupoacocearense.com.br\\\/estruturas-metalicas-2\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.grupoacocearense.com.br\\\/wp-content\\\/uploads\\\/2026\\\/06\\\/image1-4.png\",\"contentUrl\":\"https:\\\/\\\/www.grupoacocearense.com.br\\\/wp-content\\\/uploads\\\/2026\\\/06\\\/image1-4.png\",\"width\":880,\"height\":581},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.grupoacocearense.com.br\\\/estruturas-metalicas-2\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"In\u00edcio\",\"item\":\"https:\\\/\\\/www.grupoacocearense.com.br\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Como evitar deforma\u00e7\u00f5es em estruturas met\u00e1licas durante a montagem?\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/previews.elleven.digital\\\/acocearense\\\/#website\",\"url\":\"https:\\\/\\\/previews.elleven.digital\\\/acocearense\\\/\",\"name\":\"A\u00e7o Cearense\",\"description\":\"H\u00e1 mais de 45 anos no mercado brasileiro do a\u00e7o.\",\"alternateName\":\"A\u00e7o Cearense\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/previews.elleven.digital\\\/acocearense\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/previews.elleven.digital\\\/acocearense\\\/#\\\/schema\\\/person\\\/7ccebb269b40e44958dadd1a0f2e91db\",\"name\":\"Samuel Faria\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/10f596d407bb437dafc6974c4cd236a54f3393f16fca92011ac3ea64102e2b3b?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/10f596d407bb437dafc6974c4cd236a54f3393f16fca92011ac3ea64102e2b3b?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/10f596d407bb437dafc6974c4cd236a54f3393f16fca92011ac3ea64102e2b3b?s=96&d=mm&r=g\",\"caption\":\"Samuel Faria\"},\"url\":\"https:\\\/\\\/www.grupoacocearense.com.br\\\/en\\\/author\\\/samuel-faria\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Como evitar deforma\u00e7\u00f5es em estruturas met\u00e1licas durante a montagem? - Grupo A\u00e7o Cearense","description":"Descubra causas comuns de deforma\u00e7\u00f5es em estruturas met\u00e1licas e saiba como prevenir erros no transporte, soldagem e montagem.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.grupoacocearense.com.br\/en\/estruturas-metalicas-2\/","og_locale":"en_US","og_type":"article","og_title":"Como evitar deforma\u00e7\u00f5es em estruturas met\u00e1licas durante a montagem?","og_description":"Descubra causas comuns de deforma\u00e7\u00f5es em estruturas met\u00e1licas e saiba como prevenir erros no transporte, soldagem e montagem.","og_url":"https:\/\/www.grupoacocearense.com.br\/en\/estruturas-metalicas-2\/","og_site_name":"Grupo A\u00e7o Cearense","article_published_time":"2026-10-23T13:00:38+00:00","og_image":[{"width":880,"height":581,"url":"https:\/\/www.grupoacocearense.com.br\/wp-content\/uploads\/2026\/06\/image1-4.png","type":"image\/png"}],"author":"Samuel Faria","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Samuel Faria","Est. reading time":"13 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.grupoacocearense.com.br\/estruturas-metalicas-2\/#article","isPartOf":{"@id":"https:\/\/www.grupoacocearense.com.br\/estruturas-metalicas-2\/"},"author":{"name":"Samuel Faria","@id":"https:\/\/previews.elleven.digital\/acocearense\/#\/schema\/person\/7ccebb269b40e44958dadd1a0f2e91db"},"headline":"Como evitar deforma\u00e7\u00f5es em estruturas met\u00e1licas durante a montagem?","datePublished":"2026-10-23T13:00:38+00:00","mainEntityOfPage":{"@id":"https:\/\/www.grupoacocearense.com.br\/estruturas-metalicas-2\/"},"wordCount":2596,"commentCount":0,"image":{"@id":"https:\/\/www.grupoacocearense.com.br\/estruturas-metalicas-2\/#primaryimage"},"thumbnailUrl":"https:\/\/www.grupoacocearense.com.br\/wp-content\/uploads\/2026\/06\/image1-4.png","articleSection":["Sem categoria"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.grupoacocearense.com.br\/estruturas-metalicas-2\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.grupoacocearense.com.br\/estruturas-metalicas-2\/","url":"https:\/\/www.grupoacocearense.com.br\/estruturas-metalicas-2\/","name":"Como evitar deforma\u00e7\u00f5es em estruturas met\u00e1licas durante a montagem? - Grupo A\u00e7o Cearense","isPartOf":{"@id":"https:\/\/previews.elleven.digital\/acocearense\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.grupoacocearense.com.br\/estruturas-metalicas-2\/#primaryimage"},"image":{"@id":"https:\/\/www.grupoacocearense.com.br\/estruturas-metalicas-2\/#primaryimage"},"thumbnailUrl":"https:\/\/www.grupoacocearense.com.br\/wp-content\/uploads\/2026\/06\/image1-4.png","datePublished":"2026-10-23T13:00:38+00:00","author":{"@id":"https:\/\/previews.elleven.digital\/acocearense\/#\/schema\/person\/7ccebb269b40e44958dadd1a0f2e91db"},"description":"Descubra causas comuns de deforma\u00e7\u00f5es em estruturas met\u00e1licas e saiba como prevenir erros no transporte, soldagem e montagem.","breadcrumb":{"@id":"https:\/\/www.grupoacocearense.com.br\/estruturas-metalicas-2\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.grupoacocearense.com.br\/estruturas-metalicas-2\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.grupoacocearense.com.br\/estruturas-metalicas-2\/#primaryimage","url":"https:\/\/www.grupoacocearense.com.br\/wp-content\/uploads\/2026\/06\/image1-4.png","contentUrl":"https:\/\/www.grupoacocearense.com.br\/wp-content\/uploads\/2026\/06\/image1-4.png","width":880,"height":581},{"@type":"BreadcrumbList","@id":"https:\/\/www.grupoacocearense.com.br\/estruturas-metalicas-2\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"In\u00edcio","item":"https:\/\/www.grupoacocearense.com.br\/"},{"@type":"ListItem","position":2,"name":"Como evitar deforma\u00e7\u00f5es em estruturas met\u00e1licas durante a montagem?"}]},{"@type":"WebSite","@id":"https:\/\/previews.elleven.digital\/acocearense\/#website","url":"https:\/\/previews.elleven.digital\/acocearense\/","name":"Cear\u00e1 Steel","description":"In the Brazilian steel market for over 45 years.","alternateName":"A\u00e7o Cearense","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/previews.elleven.digital\/acocearense\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/previews.elleven.digital\/acocearense\/#\/schema\/person\/7ccebb269b40e44958dadd1a0f2e91db","name":"Samuel Faria","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/10f596d407bb437dafc6974c4cd236a54f3393f16fca92011ac3ea64102e2b3b?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/10f596d407bb437dafc6974c4cd236a54f3393f16fca92011ac3ea64102e2b3b?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/10f596d407bb437dafc6974c4cd236a54f3393f16fca92011ac3ea64102e2b3b?s=96&d=mm&r=g","caption":"Samuel Faria"},"url":"https:\/\/www.grupoacocearense.com.br\/en\/author\/samuel-faria\/"}]}},"_links":{"self":[{"href":"https:\/\/www.grupoacocearense.com.br\/en\/wp-json\/wp\/v2\/posts\/22964","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.grupoacocearense.com.br\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.grupoacocearense.com.br\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.grupoacocearense.com.br\/en\/wp-json\/wp\/v2\/users\/8"}],"replies":[{"embeddable":true,"href":"https:\/\/www.grupoacocearense.com.br\/en\/wp-json\/wp\/v2\/comments?post=22964"}],"version-history":[{"count":2,"href":"https:\/\/www.grupoacocearense.com.br\/en\/wp-json\/wp\/v2\/posts\/22964\/revisions"}],"predecessor-version":[{"id":23157,"href":"https:\/\/www.grupoacocearense.com.br\/en\/wp-json\/wp\/v2\/posts\/22964\/revisions\/23157"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.grupoacocearense.com.br\/en\/wp-json\/wp\/v2\/media\/22965"}],"wp:attachment":[{"href":"https:\/\/www.grupoacocearense.com.br\/en\/wp-json\/wp\/v2\/media?parent=22964"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.grupoacocearense.com.br\/en\/wp-json\/wp\/v2\/categories?post=22964"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.grupoacocearense.com.br\/en\/wp-json\/wp\/v2\/tags?post=22964"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}